Key Project Phases
Integrated project delivery (IPD) is the emerging standard for
early collaboration and effective decision-making in the building
industry today. Incorporating a Building Information Modelling
(BIM) toolset into any aspect of the IPD process enables project
teams to use information in an integrated environment, increasing
efficiency and enabling new ways of working that inspire more
creative and sustainable designs.

1. Conceptualisation
The project team comes together at the earliest stage, improving
accuracy of decisions. The rest of the process becomes more
predictable, thus avoiding costly redesign work.
Tools used - Autodesk 3ds Max Design, Autodesk Maya, IES Fastrack
schedule.

2. Design and Visualisation
Collaboration between the Architect, Contractor and Engineers
allows for better decision-making, improves quality, and mitigates
risk.
Tools used - Revit Architecture, Autodesk 3ds Max Design, Autodesk
Design Review, Fastrack schedule.

3. Implementation
Precise virtual models are automatically part of the design,
reducing uncertainty in documents and interferences during
construction.
Tools used - Revit Architecture, Autodesk Design Review Fastrack
schedule.

4. Construction
Because of careful early planning, team members are able to use
materials efficiently, creating less waste. Change orders are
minimised, and no operational revenue is lost. Construction can be
completed on schedule and on budget.
Tools used - Revit Architecture, Autodesk Design Review.

5. Own/Operate
Owners can enjoy better quality assurance on their completed
project and are provided with a complete virtual building for
operational and renovation purposes.
Tools used - Autodesk Design Review.